Commit Graph

21 Commits

Author SHA1 Message Date
David 0d31b1acc9 Work on Schematic and PCB Layout. 2012-04-29 20:50:10 +00:00
David b9f684aedd Connected Power Good signal from Switcher to PIC 2012-04-29 17:06:23 +00:00
David b9c7c511d0 Working the Switching supply further. Working toward a more realistic model for the motor. 2012-04-26 11:39:55 +00:00
David 287e873a40 Minor BOM updates for Switcher supply 2012-04-25 02:08:56 +00:00
David 07d06b10cc Working the switcher component design. 2012-04-25 00:40:31 +00:00
David 9c6b3293b5 Working on the Switching supply design 2012-04-21 17:20:46 +00:00
David df0c2b331f Updates based on design review feedback. Minor changes to schematic, BOM. 2012-04-21 01:30:47 +00:00
David 23f200ba68 Indicate that the acoustic signal is optional. 2012-04-13 22:24:55 +00:00
David 085ccd51aa Working on the requirements for the Keypad LED backlight. 2012-04-12 12:53:33 +00:00
David 3b463ce927 Calculations: Minor updates to the calculations for the A/D.
Schematic: Updated the library symbol for the micro to remove PGM which isn't on that part.
2012-04-10 11:37:10 +00:00
David 8dd287ad8d Updates based on design review from 20120405 2012-04-06 20:20:06 +00:00
David a03312b071 Major update to schematic (rev 0.3), including renumbering most components.
Updated the IO Allocation to match the hardware design.
Updated the Calculations sheet, which has the BOM.
Updated the Data Sheet.
2012-04-02 02:34:02 +00:00
David 357c1f7fa2 Update BOM and adjust PCB layout 2012-03-31 06:40:56 +00:00
David 9a554bd161 Small amount of work rearranging the calculations spreadsheet. 2012-03-25 15:51:40 +00:00
David 11ae1d1ef7 Updated System Block diagram in many areas, mostly related to Power Management.
Minor update to schematic and PCB for touch tail connectors.
2012-03-23 19:42:49 +00:00
David fdba25da8a remove unnecessary simulation. 2012-03-23 18:12:57 +00:00
David f171b4c4c0 Programming connector details updated 2012-03-20 15:54:20 +00:00
David ef99909459 Schematic and BOM work. Also, some load dump simulation. 2012-03-20 15:20:44 +00:00
David d27d9bd984 BOM Development, including mechanical sizes and price estimates. 2012-03-18 22:00:07 +00:00
David 042381c2ab Move the system diagram up to the top
Delete the PowerLock Design Activities.xls because it is maintained in WindChill instead.
2012-03-18 18:21:33 +00:00
David d476653fd2 Reorganize folder structure 2012-03-18 17:54:33 +00:00